Direct export supply of high-efficiency, multi-protocol charging hardware engineered for Charge Point Operators (CPOs), commercial fleets, municipal depots, and retail hubs in Berlin.
Navigating the stringent standards, grid connection requirements, and operational demands of Berlin’s fast-expanding EV charging ecosystem.
As the Federal Capital of Germany, Berlin stands at the forefront of the European clean mobility transition. Driven by the Berlin Climate Protection and Energy Transition Act (EWG Bln) and the European Union’s Alternative Fuels Infrastructure Regulation (AFIR), the Berlin-Brandenburg metropolitan region is undergoing an unprecedented expansion of public, fleet, and commercial charging corridors.
Deploying EV charging stations in Berlin requires strict adherence to European electrical engineering standards, dynamic grid load management, and seamless backend interoperability via standard protocols such as OCPP 1.6J and OCPP 2.0.1.
Information Gain Key Factor: EV Charger deployment in Germany must satisfy national calibration laws (Eichrecht) for public billing transparency, VDE-AR-N 4100 grid connection rules, and Stromnetz Berlin technical connection requirements (TAB).
Berlin's urban distribution grid, managed primarily by Stromnetz Berlin, imposes strict guidelines on peak power draw, total harmonic distortion (THD), and power factor correction (PFC). High-power DC fast chargers (from 30kW wallboxes up to 240kW ultra-fast dispencers) must feature active power factor correction (PFC > 0.99) and programmable dynamic load management (DLM) to prevent localized transformer overloads.
Our exported DC fast charging stations incorporate state-of-the-art silicon carbide (SiC) power electronics topologies, ensuring whisper-quiet operation, high efficiency across wide load curves, and seamless interfacing with building management systems (BMS) and smart grid gateways.
Purpose-built EV charging hardware tailored to the operational realities of Berlin's urban geography, logistics hubs, and commercial fleet depots.
Deploying 20kW to 60kW DC Wallboxes and mobile CCS2 chargers at inner-city logistics depots in Tempelhof, Neukölln, and Westhafen. Enables rapid overnight top-ups and mid-shift fast charging for light commercial vehicles (LCVs) delivering within Berlin's Low Emission Zone (Umweltzone).
Dual-gun 80kW to 160kW ground-mounted DC stations equipped with POS payment terminals and RFID reader modules. Engineered for subterranean and outdoor parking facilities in Mitte, Charlottenburg, and Alexanderplatz, meeting European accessibility and contactless billing regulations.
Ultra-high power 180kW to 240kW dual-connector split systems for electric heavy-duty vehicles and private commuter shuttle fleets servicing the BER Airport (BER Berlin Brandenburg Airport) corridor and regional transport routes.
Technical specification overview of direct export models available for installation across German and European commercial sites.
| Model Series | Power Output | Connector Options | Protection Rating | Communication & Backend | Primary Application |
|---|---|---|---|---|---|
| Compact DC Wallbox | 20kW / 30kW / 40kW | CCS2, CCS1, CHAdeMO, GB/T | IP55 / IK10 | OCPP 1.6J / Ethernet / 4G | Fleet Garages, Dealerships, Workplaces |
| Commercial Mid-Power | 60kW / 80kW Dual | Dual CCS2 / CCS2 + CHAdeMO | IP55 Ground-Mount | OCPP 1.6J / RFID / POS Terminal | Retail Outlets, Hotel Car Parks, CPOs |
| High-Power Fast Charger | 120kW / 160kW / 240kW | Dual CCS2 (Liquid Cooled Option) | IP55 Outdoor Heavy Duty | OCPP 1.6J & 2.0.1 / ISO 15118 | Highway Corridors, Bus Depots, Public Charging |
| Mobile Emergency DC | 15kW / 20kW Movable | Single CCS2 / 5m Cable | Rugged Mobile Frame | Manual / App Interface | Roadside Assistance, Workshop Maintenance |
Leveraging 35+ years of industrial power supply development, high-voltage DC/DC converters up to 900V, and automated test system engineering.
Our underlying technology platform draws directly from decades of automotive assembly line battery charging computers and potted industrial power supplies. Unlike standard commercial off-the-shelf chargers, our internal power modules utilize contact cooling technology and fully potted electronic sub-assemblies.
This eliminates dust ingress, moisture degradation, and vibration vulnerabilities—ensuring continuous full-power operation even under harsh ambient temperatures ranging from -30°C in Northern German winters up to +55°C high-humidity conditions.
Every EV charger exported to Berlin undergoes 100% automated end-of-line testing using in-house DTS (Deutronic Test Software) automated test stations. We perform strict insulation resistance checks, high-voltage breakdown tests, thermal stress profiling, and complete CAN bus diagnostic verifications.
As a complete system supplier—from SMT/THT PCB assembly to custom firmware implementation—we guarantee single-source traceability and long-term spare part availability for key regional infrastructure projects.
Direct answers for Charge Point Operators, electrical contractors, municipal buyers, and fleet managers in Germany.
Yes. Our commercial export chargers can be configured with Eichrecht-compliant DC energy meters (e.g., Iskraemeco or Nicole) and transparent data storage modules (Transparency Software compatible). This allows CPOs and commercial operators in Berlin to legally bill end-users per kilowatt-hour (kWh) in compliance with German weights and measures legislation (Mess- und Eichrecht).
For Berlin and the wider European market, our primary configuration features dual CCS2 (Combined Charging System Type 2) connectors with cable lengths ranging from 5m to 7.5m. Options for CHAdeMO and Type 2 AC socket outlets can be customized upon request for multi-protocol public installations.
Our chargers support dynamic load balancing (DLM) and Modbus TCP / CAN bus interfaces to communicate directly with building management systems, energy management systems (EMS), and local transformer stations. Integrated active PFC ensures compliance with VDE-AR-N 4100 grid codes, preventing harmonics contamination on the local low-voltage network.
All smart DC fast chargers are pre-configured with open standard OCPP 1.6J (JSON over WebSockets) and are upgradeable to OCPP 2.0.1. They have been verified for interoperability with leading European CPO management systems including Has·to·be, Monta, ChargePoint, Virta, and Driivz.
Standard DC wallboxes (20kW-60kW) are manufactured and dispatched within 2 to 3 weeks for express air freight or 4 to 5 weeks for sea freight to European ports (Hamburg/Bremerhaven), with onward door-to-door delivery directly to logistics sites in Berlin-Brandenburg. Custom OEM branding and color options are available for project orders.
We supply a standard 24-month comprehensive factory warranty, extendable up to 5 years under enterprise SLA agreements. Sub-assemblies (power modules, main controller boards, display units) are modularized for plug-and-play field replacement by certified local electrician teams in Berlin.
Consult with our senior application engineers to obtain technical datasheets, CAD drawings, Eichrecht compliance packages, and factory-direct export pricing tailored to your site requirements.